0 Decom references – Jansen Marine & Offshore
Menu Sluiten

Decom references

Since 2017 we have been actively involved in decommissioning and have supplied both complete Aids to Navigation systems, as well as parts for solutions designed by the clients themselves.

Reference 1: Marking of abandoned platforms

  • Client: Oil & Gas Major
  • Year: 2017
  • Location: Southern part of North Sea
  • Number of platforms: 5 satellite platforms
  • Duration of marking: 3-5 years
  • Scope: Design, Manufacturing, Assembly, Testing, Delivery and Offshore Commissioning of a fully autonomous AtoN system, comprising of marine lanterns, fog signal, fog detector, Aviation Obstruction Lights, AIS and a remote monitoring system fully integrated in the system in the control room of the client
  • Solution provided: 3 skids with PV modules, battery boxes and control panels per platform, combined with Nova 65 HI marine lanterns, an AB-560 fog signal, a Sentry visibility detector, iLED Taurus AOL’s, Informer V-20 AIS AtoN, and a SRM kit consisting of datalogger,
  • Power supply: batteries charged by means of solar power
  • Status: project completed
Skids on the helideck, PV modules charging the batteries

Reference 2: Marking of abandoned platforms

  • Client: Oil & Gas Major
  • Year: 2018
  • Location: Southern part of North Sea
  • Number of platforms: 3 satellite platforms
  • Duration of marking: up to 1 year
  • Scope: Design, Manufacturing, Assembly, Testing, Delivery and Offshore Commissioning of a fully autonomous AtoN system, comprising of marine lanterns, fog signal, fog detector, Aviation Obstruction Lights, AIS and a simple remote monitoring system
  • Solution provided: 2 skids with PV modules, battery boxes and control panels per platform, combined with Nova 65 HI marine lanterns, an AB-560 fog signal, a Sentry visibility detector, iLED Taurus AOL’s, and a SRM-2 remote monitoring unit with web portal
  • Power supply: batteries charged by means of solar power
  • Status: project completed
Skids on the helideck of an abandoned platform

Reference 3: Marking of abandoned platforms

  • Client: Oil & Gas Major
  • Year: 2018
  • Location: Southern part of North Sea
  • Number of platforms: 2 satellite platforms
  • Duration of marking: not known
  • Scope: Delivery of new LED lanterns to replace existing incandescent lanterns. Client designed their solution to supply power to the Aids to Navigation equipment, as well as other equipment that needed to remain active
  • Products supplied: MLED-300 lanterns for platform 1 and NOVA-65 HI for platform 2 (due to delivery time requirements)
  • Status: project completed
MaxiHALO 60 LED flashers for the MLED-300 lanterns during programming and testing

Reference 4: Marking of abandoned platforms

  • Client: Oil & Gas Major
  • Year: 2018-2019
  • Location: Southern part of North Sea
  • Number of platforms: 2 main platforms
  • Duration of marking: not known
  • Scope: Delivery of new LED lanterns to replace existing incandescent lanterns. Client designed their solution to supply power to the Aids to Navigation equipment, as well as other equipment that needed to remain active
  • Products supplied: MLED-300 lanterns for platform 1 and NOVA-65 HI for platform 2 (due to delivery time requirements)
  • Status: project completed